Review PT06 plug and PT07 jam-nut receptacle requirements. Preserve the full references and check panel cutout, installation access and supplied hardware.

In the PT solder-contact family discussed here, PT06 identifies a straight plug and PT07 a jam-nut receptacle. Those body styles can start a mating and panel-mounting review, but the complete references still need to agree with the interface and installation requirements. [1]

For a replacement panel connector, keep the cable-side reference and the existing panel drawing together. A correct electrical configuration does not automatically make a receptacle fit the opening already in the equipment.

Straight cable plug sample showing socket contacts and cable clamp
Straight cable plug sample showing socket contacts and cable clamp

Figure 1. Real straight-plug sample with socket contacts and a cable clamp. Plug/receptacle describes the shell form; pin/socket describes its contacts. This picture is not a PT07 receptacle.

Preserve the full PT designation

A useful request retains the class, shell/arrangement, contact designation, rotation and any additional options. “PT06 to PT07” does not state those fields.

For example, when a requirement reads PT06A-10-6P, retain that exact reference. Do not silently change A to another service class or drop an accessory option because a shorter reference looks familiar. Ask for the complete proposed PT07 reference and the supporting interface drawing before treating it as a mating candidate.

The manufacturer catalog also distinguishes other configurations, including hermetic PT07H and PT-SE crimp variants. They should not be collapsed into a single generic “PT07 panel socket.” [1]

FieldCable-side recordPanel-side record
Complete designationFull plug referenceFull proposed or installed receptacle reference
Shell and arrangementPreserve the paired shell/layout designationConfirm the corresponding documented configuration
ContactsRecord P/S and the applicable contact systemConfirm the complementary configuration
PolarizationPreserve any normal or alternate position requirementCheck against the applicable mating information
Class and optionsRetain the original class and rear requirementsIdentify the actual receptacle construction and supplied hardware

The MS3116/PT06 guide explains the related cross-reference question. This article focuses on the panel interface once the two body styles have been identified.

Read the panel drawing as an installation requirement

For a jam-nut receptacle, request the drawing for the exact product configuration. Check the panel opening, any anti-rotation feature, the applicable panel-thickness requirements and the space to install and retain the hardware.

Do not use a perspective photograph as a cutout template. Do not transfer dimensions from a visually similar receptacle or assume that all PT07 suffixes share the same installation information.

Ask the equipment team to identify:

  • Which side of the panel receives each part of the assembly.
  • Whether rear access is available for installation and service.
  • Which component establishes the mounting and retention arrangement.
  • How far the connector and cable project on each side.
  • Which specified sealing and rear components are included in the order.
PT07 panel installation review fields
PT07 panel installation review fields

Figure 2. Original panel-review checklist. Obtain the actual PT07 configuration drawing for every dimension; this is not a mounting drawing or a product photograph.

Keep installation and supply questions on the same quotation

The offered connector should be identified by its actual maker/item or complete proposed reference. The quotation should also state whether the specified mounting hardware, contacts and rear components are included. Where a drawing or option remains unresolved, keep that condition visible.

If a current panel cannot be changed, state that restriction at the start. If a change may be considered, identify the approval route before ordering. A supplier's candidate configuration is not by itself permission to modify equipment.

Add an overview before the request leaves the workshop

Steve Swanson working with electrical connectors during station maintenance
Steve Swanson working with electrical connectors during station maintenance

Figure 3. Steve Swanson working during maintenance involving electrical connectors, 9 April 2014. The photograph illustrates installation access and is not a PT06/PT07 mating demonstration. Credit: NASA/Rick Mastracchio. Original archive. Context only; the connector series is not identified and this is not a Tradin installation or endorsement.

An overall view should show the panel surroundings and cable route. Pair it with a readable side marking, a straight-on mating-face photograph and the panel drawing. That gives a sourcing reviewer both the identification and installation evidence.

For a MIL-DTL-26482 sourcing review, send the complete references for both halves, quantity and required arrival date. Add original-only or alternative-evaluation conditions and the documents needed with delivery.

Request a PT06/PT07 mating and panel-interface review →

Reference

[1] Amphenol PT Series catalog, 12-070-20, printed pages 16–17 for PT06/PT07, pages 21–25 for hermetic distinctions and ordering, plus the relevant configuration drawing. Checked 18 October 2026.

FAQ

Does PT06/PT07 alone identify a complete mating pair?

No. The complete class, shell/arrangement, contact configuration, polarization and applicable interface requirements still need review.

Do all PT07 suffixes have the same installation drawing?

Do not assume so. Use the exact product configuration and drawing, including any hermetic or other construction distinctions.

What should accompany a panel-replacement inquiry?

Both full references, a panel drawing, labelled photographs from the required sides, quantity, required date and the purchase/document conditions.